| Sep 20 2006 Wednesday |
| Moderator: Wang Longxing, Deputy Secretary General of SICA |
| |
08:00 ¨C 09:00 |
Registration |
| |
09:00 - 09:10 |
Opening Address
Adonis Mak, Publisher, CleanRooms China |
A1 |
09:10 - 09:55 |
Characteristic of the Clean Room Air Conditioning System for Electronic Industry
Zhou Zhigang, Vice Chief Engineer/ Senior Engineer
Shanghai Electronics Engineering Design & Research Institute Co., Ltd |
A2 |
09:55 - 10:40 |
Selecting Sample Points of Airborne Particle Counting in CleanRoom
Chen Yi, Sales Business of Electronic/ life Science MarketHach Ultra |
| |
10:40 - 11:00 |
Tea Break |
A3 |
11:00 - 11:45 |
Security of AMC Free Environment for Sub-130nm Fab
Edward Zhao, Molecular filtration engineer
Camfil Farr Trading (Shanghai) Co., Ltd. |
A4 |
11:45 - 12:30 |
The New Technology of Liquid Leakage Detection and The Application in CleanRoom
Stone Ni, ITS Manager
NATop (Shanghai) Information Technology Co., Ltd. |
| |
12:30 - 14:00 |
Lunch |
A5 |
14:00 - 14:30 |
Application of Multi-Function Survey Mater in Cleanroom
Yang Guanghan, Central & Eastern China Area Sales ManagerTesto AG |
A6 |
14:30 - 15:15 |
Microlevel Cleaning
George Zhou, Marketing Specialist, Sontara Nonwovent
Du Pont China Holding Co., Ltd |
| |
15:15 - 15:35 |
Tea Break |
A7 |
15:35 - 16:20 |
ESD Standards and Measurements for the Cleanroom
Luo Hongchang, Secretary General
Shanghai Electrostatic Protective Industrial Association |
| |
16:20 - 16:45 |
Lucky Draw |
| |
| Sep 21 2006 Thursday |
| Modeartor: Xue Zi, Deputy Secretary General of SICA |
| |
08:00 ¨C 09:00 |
Registration |
B1 |
09:00 - 09:45 |
IC Factory Cleanroom Design
Wang Haixu, Designer Manager
Eleven Design and Research Institute |
B2 |
09:45 - 10:45 |
The Baseline, Rountine Monitor and Measure of ESD & AMC Control in The Environment Control Process
Peter Maguire , VP of Asia Pacific Sales
Lighthouse Worldwide Solutions |
| |
10:45 - 11:00 |
Tea Break |
B3 |
11:00 - 11:45 |
Construction & Operation Cost Analysis of Different Cleanroom Systems
Tony Xu, Marketing Manager/ Engineer Manager
Nanjing IAQ Engineering Co., Ltd. |
| |
11:45 - 13:00 |
Lunch |
Training Lecture |
B4 |
13:00 - 14:00 |
he Test Run, Certification and Productive Maintenance for Cleanroom HVAC System
Charlie, J.L. Shyu, President
United Integrated Services Co., Ltd. |
B5 |
14:00 - 15:00 |
Research of Energy Saving of Electronic ClearnRoom
Zhou Zhigang, Vice Chief Engineer, Senior Engineer
Shanghai Electronics Engineering Design & Research Institute Co., Ltd. |
| |
15:00 - 15:15 |
Tea Break |
B6 |
15:15 - 16:15 |
200mm & 300mm Fab Cleanroom Design & Saving Energy & Method
Qin Xueli£¬ Chief Engineer
China Electronics Engineering Design Institute |
B7 |
16:15 - 17:15 |
Fundamentals of Contamination Control and Particle Counting
Peter Maguire , VP of Asia Pacific Sales
Lighthouse Worldwide Solutions |
| |
17:15 - 17:45 |
Lucky Draw |
| ** Please return the questionaire to anyone of our staff at the end of the conference to qualify for the lucky draw.! |